Builders& home renovators
Built square.
Finished properly.
Keystone Build Co. is a fictional builder that plans, builds and finishes extensions, lofts, kitchens and whole-house renovations, with one site lead from first survey to final snag.
- Extensions
- Loft conversions
- Kitchens
- Renovations
01Services
Four trades under one site lead
Pick a service to see what a typical job involves. Durations and sizes are illustrative examples, not commitments.
Rear, side and wrap-around extensions
More ground-floor space without moving house. We would handle the drawings, the structural design and the approvals, then build it with the same crew from footings to final coat of paint.
Typically involves
- Measured survey and planning drawings
- Structural calculations and building control
- Foundations, steelwork, shell and roof
- Glazing, first and second fix, plastering and decoration
- Typical footprint
- 12 to 40 m² (sample)
- On site
- 10 to 20 weeks (illustrative)
- Living at home?
- Usually yes, with a sealed-off work zone
Try the estimator below for an illustrative cost range.
Dormer, hip-to-gable and roof-light lofts
Turn the void under the roof into a bedroom, an office or a shower room. Most of the work happens from scaffold, so the house below stays liveable for longer.
Typically involves
- Head-height and structure check on the survey
- Dormer or roof-light design and approvals
- New floor joists, insulation and fire-safe escape route
- Stair, en suite, electrics and finishes
- Minimum head height
- About 2.2 m at the ridge (rule of thumb)
- On site
- 6 to 12 weeks (illustrative)
- Scaffold
- Needed for most dormers
Party-wall agreements may apply to terraced and semi-detached homes.
Knock-throughs and kitchen rebuilds
From swapping units to taking out a load-bearing wall and starting again. We would coordinate the steel, the trades and the fitters so the kitchen is out of action for as few weeks as possible.
Typically involves
- Layout planning around plumbing, gas and extraction
- Wall removal with steel beams where needed
- New electrics, lighting and underfloor heating options
- Units, worktops, tiling and appliance fitting
- Typical room
- 12 to 30 m² (sample)
- On site
- 4 to 8 weeks (illustrative)
- Temporary kitchen
- Set up in another room on request
We would never fit a kitchen we did not plan with you first.
Whole-house and period renovations
Rewiring, replumbing, new heating, replastering and layout changes, sequenced so the messy work happens once. Suited to tired period homes and recent purchases.
Typically involves
- Condition survey and a phased schedule of works
- Strip-out, damp and structural repairs
- Rewire, replumb and heating upgrade
- Plastering, joinery, flooring and decoration
- Scope
- Single floor to whole house
- On site
- 8 to 26 weeks (illustrative)
- Living at home?
- Depends on the phase; we would plan it with you
Older homes can hide surprises, so we would always price a contingency.
02Extension estimator
Rough out an extension budget
Adjust the size, storeys, finish and region band to see an illustrative cost range. Every rate here is a sample figure for a fictional builder, not a quote or market data.
Illustrative range
Sample figures£58,000to£76,000
Illustrative range £58,000 to £76,000 for 24 square metres of floor area.
- Floor area
- 24 m²
- Per m²
- £2,417 to £3,167
- On site
- 11 to 15 weeks
| Line | Low | High |
|---|---|---|
| Construction and fit-out | £50,500 | £62,500 |
| Survey, drawings and approvals | £3,500 | £6,000 |
| Suggested contingency | £4,000 | £7,500 |
| Total (sample) | £58,000 | £76,000 |
- Sample rates only. Real costs depend on ground conditions, access, structure and specification.
- Excludes kitchen units, appliances, VAT and party-wall fees.
- Rounded to the nearest £500. Not a quote and not a promise of price.
03How a job runs
Six stages, no surprises
An example of how a typical extension could run from first visit to handover. Timings are illustrative and vary with approvals and scope.
- Week 1
Stage 1: Site survey
A site lead visits, measures up, checks access and structure, and listens to what you want the space to do.
- Weeks 2 to 5
Stage 2: Design and drawings
Measured drawings, layout options and a first specification, revised with you until the plan is right.
- Weeks 4 to 12
Stage 3: Approvals
Planning or permitted-development checks, building control, structural calculations and party-wall notices.
- Before any work
Stage 4: Fixed-scope quote
A written, itemised quote with stage payments tied to finished work, and a priced list of any options.
- On site
Stage 5: Build
One site lead runs the crew. You get a weekly update on progress, the next week and any decisions needed.
- Final week
Stage 6: Snagging and handover
A walk-round together, a snag list closed out in writing, and the certificates and manuals handed over.
04Sample projects
The kind of work Keystone would take on
These are fictional example briefs to show scope and scale. They are not real homes, clients or finished jobs, and no outcomes are claimed.
Showing 6 sample projects
- FictionalExtensionSample brief
Single-storey rear extension
Victorian mid-terrace (sample)
Open the back wall, add a flat-roof extension with a roof lantern and bifold doors.
- Size
- 22 m² footprint
- Programme
- 12 to 15 weeks planned
- FictionalExtensionSample brief
Wrap-around extension
1930s semi-detached (sample)
Side return and rear infill combined into one L-shaped kitchen and dining space.
- Size
- 34 m² footprint
- Programme
- 16 to 20 weeks planned
- FictionalLoft conversionSample brief
Rear dormer loft conversion
End-of-terrace (sample)
Full-width dormer with a double bedroom, shower room and a new staircase.
- Size
- 28 m² new floor area
- Programme
- 8 to 11 weeks planned
- FictionalLoft conversionSample brief
Roof-light loft room
Detached bungalow (sample)
Insulate and board the roof void, add four roof lights and a fixed stair.
- Size
- 19 m² new floor area
- Programme
- 6 to 8 weeks planned
- FictionalKitchenSample brief
Knock-through kitchen
1960s townhouse (sample)
Remove a load-bearing wall with a steel beam and fit a new kitchen with an island.
- Size
- 18 m² room
- Programme
- 5 to 7 weeks planned
- FictionalRenovationSample brief
Whole-house renovation
Edwardian semi (sample)
Rewire, replumb, new heating, replastering and a reworked ground-floor layout.
- Size
- 3 floors
- Programme
- 20 to 26 weeks planned
05Commitments
What a builder like this might promise
Examples of commitments a builder could offer its customers, written for a fictional company. They are not real accreditations, memberships or insurance-backed warranties.
A written, itemised quote
A builder like Keystone could commit to pricing the agreed scope in writing before work starts, with options priced separately.
Stage payments, never all upfront
Payments could be tied to finished stages such as footings, shell and first fix, so you only pay for work you can see.
One named site lead
The same person on site from start to handover, reachable during working hours and responsible for the whole crew.
Variations priced before they happen
Any change is written up and priced for you to approve first. Nothing extra appears on the final invoice.
A tidy, safe site every day
Dust sheets, a swept site, secured scaffold and a clear safe route past the work for anyone living at home.
A written workmanship guarantee
A promise to come back and put right defects in the work for an agreed period after handover, stated in the contract.
06FAQ
Straight answers
No. Keystone is a fictional company designed by CraftLayer Studio to show how a builder or renovator website could work. No surveys are booked, no quotes are issued and no building work takes place.
It is illustrative only. The rates, region bands and fees are invented sample figures chosen to make the tool feel realistic. A real builder would price from a site survey and drawings.
It depends on the size, the position on the house and local rules. Many smaller rear extensions fall under permitted development, but always check with your local planning authority before you commit.
For most extensions and lofts, yes. The work zone is sealed off and the messiest stages are planned in advance. Whole-house renovations sometimes need a short move-out during rewiring and plastering.
In this concept, a site lead visits for about an hour, measures up, looks at access, drainage and structure, and talks through what you want. You would get a written summary afterwards.
In this concept, Keystone would coordinate building control and structural calculations and help you serve party-wall notices. Any surveyor or council fees would be listed separately in the quote.
07Site survey
Request a site survey
Tell us about the job and pick a preferred day. In a real version of this site, a site lead would confirm a visit. Here, nothing leaves your browser.